Our Work
Emergency measures to stabilize the banks of the tailrace from the Fleet Street Pumping Station, a key component of the water distribution system for downtown. The project entailed clearing and grubbing slopes approaching 45 degrees, removal of fill and construction of re-inforced earth walls at the toe of the banks to permit re-establishing safer slopes. Owner: City of Ottawa Consultants: Robinson Consulting Engineers Photos – Fleet Street 1, Fleet Street 2, Fleet Street 3 |
|
|||||||||||||